Evidence software for passive fire protection contractors
Passive fire protection is a trade whose work disappears behind a ceiling the week it is finished, so the evidence is the product. Estimark keeps a before-and-after photograph pair per penetration, timestamped and visible to the client in the portal; runs a checklist of your own per area with a pass, fail or n/a and a photograph against each item and a signature on the sheet; pins each snag to the current drawing revision and carries the pin forward when the sheet is reissued; and holds the RFI to the main contractor about the detail with the dated answer. It holds no third-party certification and no fire-stopping register of its own, and the handover pack compiles the certificates you upload.
What actually goes wrong
The photograph proves nothing on its own
Four hundred pictures of sealed penetrations, none of them saying which riser, which floor, or what it looked like before.
The detail was never confirmed
The service went through a wall the drawing did not show. The question was asked on the phone, answered on the phone, and nobody wrote the answer down.
The drawing changed under the snags
Revision C moved the corridor. Every snag pinned to revision B now points at a wall that is not there.
The checklist is a spreadsheet with ticks
Pass, pass, pass, no photographs, no signature, and the main contractor’s clerk of works wants to know who signed it and when.
Sector: how it works
How is each penetration evidenced?
Photo Management holds a before-and-after pair as a comparison group against the job, each photograph timestamped, in albums per floor or riser, and visible to the client in the portal if you choose.
- A photograph is tagged to the job rather than sitting in a camera roll, so the riser on the fourth floor is findable by job and album rather than by scrolling.
- The client portal shows the client-visible photographs and the job’s progress without a login on your system.
- Photo Management is included from Solo and the client portal from Core.
How do inspection checklists work?
Quality Assurance holds checklist templates of your own, with ordered items each given a pass, fail or n/a, a note and a photograph, and the completed sheet signed off with a name, a date and a drawn signature.
- A template is reused per area, so the same items are checked on every floor in the same order.
- A failed item is recorded with its note and its photograph, so the sheet shows what failed and what it looked like rather than a tick that was not given.
- Quality Assurance is included from Core.
NoteThe checklist is yours. Estimark ships no fire-stopping inspection standard, and a template that checks the wrong things passes them just as readily.
What happens to snags when the drawing is reissued?
A snag is pinned to a location on the current drawing revision. When a new revision is issued, the pins are carried forward for a person to confirm or move, so a snag does not point at a wall the new sheet removed.
- Each snag has a photograph, an assignee and a status that runs open, in progress, rectified and signed off.
- Revisions are held with the one that is current and the date the previous one was superseded.
- Defect Management is included from Core.
How do I get the detail confirmed in writing?
An RFI is a numbered question to the main contractor or the designer with a date asked, a date needed and a dated answer, and the correspondence log holds the letter or the email that went with it.
- The question about the unshown service and the answer that says what to do about it are on the job, dated, rather than on a phone.
- RFI Management and the Correspondence Log are included from Core.
What about safety and the subcontract?
RAMS are versioned so an operative signs a specific revision, permits to work cover hot work and working at height, and a COSHH entry holds each intumescent product with its CAS number and safety data sheet.
- Toolbox talks are logged with a signed attendance list, and QR site attendance can be gated on induction, CSCS card and a signed RAMS.
- A payment application carries the cumulative valuation, retention and the Construction Act dates, and the reverse charge is set on the main contractor once. Payment Applications is included from Pro.
- The accreditations of the subcontractors you bring in are tracked with an expiry in Subcontractor Management: CHAS, SafeContractor, Constructionline, SMAS, Acclaim and the ISO standards among them.
NoteThird-party fire-stopping certification schemes are not on the tracked list, and Estimark holds no golden thread submission. The handover pack compiles the certificates you upload as compliance certificates.
Which plan does a fire protection contractor need?
Core at £129 a month +VAT covers up to 5 users with no job limit and carries Quality Assurance, Defect Management, RFI Management and the client portal.
- Pro at £299 a month +VAT covers up to 20 users and adds Payment Applications and Warranty Management.
- Solo is £39 a month +VAT for 2 users and 20 open jobs, with Health & Safety and Photo Management already on it.
The evidence, in numbers
- Per penetration
- A before-and-after pair, timestamped
- Checklist item
- Pass, fail or n/a, note, photograph
- Checklist sheet
- Signed with a name, date and signature
- Snag on a reissued drawing
- Pin carried forward, confirmed by a person
- Certification scheme
- Not held
- Core
- £129/month +VAT
Core
£129 +VAT/month
Up to 5 users, no job limit, with Quality Assurance, Defect Management, RFI Management and the client portal.
What you get
- Before-and-after photograph pairs visible to the client
- Inspection checklists with a photograph per item
- Snags pinned to the current drawing revision
- RFIs with a dated answer
- Versioned RAMS, permits and COSHH
Pro at £299/month +VAT adds Payment Applications for the subcontract valuation. Solo is £39/month +VAT for 2 users and 20 open jobs.
Questions
Passive fire protection: frequently asked
Can Estimark keep a before-and-after photograph of every fire stop?
Yes. Photo Management holds a before-and-after pair as a comparison group against the job, each photograph timestamped, in albums per floor or riser, and visible to the client in the portal if you choose.
Does Estimark hold a fire-stopping register or third-party certification?
No. There is no fire-stopping register and no fire door inspection type, and third-party certification schemes are not on the accreditation list. What it holds is the evidence: photographs, checklists with a photograph per item, snags on the drawing, and the certificates you upload into the handover pack.
What happens to my snags when the drawing changes?
Each snag is pinned to a location on the current revision. When a new revision is issued, the pins are carried forward for a person to confirm or move, and the previous revision is kept with the date it was superseded.
How much is Estimark for a passive fire protection contractor?
Solo is £39 a month +VAT for 2 users and 20 open jobs. Core is £129 a month +VAT for up to 5 users with no job limit. Pro is £299 a month +VAT for up to 20. Every plan has a 14-day free trial.
Related
RAMS & site safety
Versioned RAMS, operative sign-off, inductions, permits and the muster roll.
Quality assurance module
Inspection checklists with a pass, fail or n/a and a photograph per item, signed off as a sheet.
Photo management module
Timestamped photographs against the job, albums, and before-and-after pairs.
Payment applications & retention
Construction Act dates, pay less deadlines and retention release.
Try it on a real job.
14 days, full access, every plan. No implementation fee. All prices exclude VAT, added at 20% at checkout.