Dayworks
Work valued on the actual labour, plant and materials used plus a percentage, where no applicable rate exists. It needs signed daywork sheets at the time. A daywork claim assembled afterwards from memory is the one most often reduced.
Last reviewed by Estimark. This page states periods and rates set by statute or by standard contract terms. Those move, and this date is when somebody last read the page against its source rather than the day the site was built.