Do you need planning permission for a house extension?
The short answer
Often not, in England. Class A of Part 1 of Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015 grants planning permission for many house extensions. A single-storey rear extension can go 3 metres beyond the original rear wall, or 4 metres if detached, and up to 6 or 8 metres through prior approval, at no more than 4 metres high. A two-storey rear extension can go 3 metres and must keep 7 metres from the rear boundary. A side extension must be single storey, no more than 4 metres high and no wider than half the original house. Later buildings may cover no more than half the garden. The rights do not apply to flats, are cut back on designated land such as conservation areas, and can be removed by an Article 4 direction or a planning condition. Building Regulations approval is separate.
At a glance
- Legislation
- GPDO 2015, Schedule 2, Part 1, Class A (England)
- Single-storey rear
- 3 m, or 4 m if detached
- With prior approval
- 6 m, or 8 m if detached
- Single-storey height
- No more than 4 m
- Two-storey rear
- 3 m deep, 7 m from the rear boundary
- Within 2 m of a boundary
- Eaves no higher than 3 m
- Coverage
- No more than 50% of the garden
- Prior approval
- Work may start after 42 days with no decision
What is permitted development for a house extension?
Permitted development is planning permission granted by a national order rather than by an application to the council. Article 3 of the Town and Country Planning (General Permitted Development) (England) Order 2015 grants it for the classes of development in Schedule 2, subject to the limits and conditions each class sets. Class A of Part 1 covers the enlargement, improvement or other alteration of a house, which takes in rear and side extensions.
Two definitions in article 2 decide most cases. The original house is the house as it stood on 1 July 1948, or as it was built if built later, so an earlier owner’s extension counts against the limits and does not move the rear wall. A dwellinghouse does not include a flat or a building containing flats.
An extension is permitted development only if it meets every limit and condition in every class that applies to it. A two-storey extension whose roof joins the main roof has to satisfy Class A and Class C together.
NoteThe limits here are England’s. Class A was last amended in 2021, and the latest change to Part 1, in force on 9 April 2026, corrected wording in the class for additional storeys. Wales has its own amended version of the 1995 order, Scotland has the Town and Country Planning (General Permitted Development) (Scotland) Order 1992, and Northern Ireland has the Planning (General Permitted Development) Order (Northern Ireland) 2015. Their limits differ, so check them in the order for that country.
How far can a rear extension go without planning permission?
| Rule | Limit | Class A paragraph |
|---|---|---|
| Single-storey rear depth | 3 m beyond the rear wall of the original house; 4 m if detached | A.1(f)(i) |
| Larger single-storey rear depth | 6 m; 8 m if detached; only through prior approval, and not on designated land or an SSSI | A.1(g), A.4 |
| Single-storey height | No more than 4 m | A.1(f)(ii) |
| More than one storey | No more than 3 m beyond the rear wall, and not within 7 m of the boundary opposite the rear wall | A.1(h) |
| Within 2 m of any boundary | Eaves of the extension no higher than 3 m | A.1(i) |
| Overall height and eaves | Not above the highest part of the existing roof; eaves not above the existing eaves | A.1(c), (d) |
| Front and highway side | Not beyond the principal elevation, or a side elevation that fronts a highway | A.1(e) |
| Coverage | Buildings other than the original house cover no more than 50% of the curtilage, not counting the original house | A.1(b) |
| Joining an existing extension | The limits apply to the total enlargement | A.1(ja) |
| Not included | A verandah, balcony or raised platform over 0.3 m, a chimney, flue or soil and vent pipe, or any alteration to the roof | A.1(k), para I |
Limits from Schedule 2, Part 1, Class A of the 2015 Order (England), as in force in October 2026.
The government’s technical guidance sets out how to measure. Depth runs from the base of the original rear wall to the outer face of the extension wall, not counting gutters or barge boards. Height is measured from the ground next to the building, and on sloping ground from the highest part of it. The rear wall is the wall directly opposite the front, and where the original back of the house is stepped, each step is a rear wall.
Measure from the drawings before anyone commits to a design. Where the house has been extended before, measuring from the existing back wall instead of the original one is an easy mistake to make. See how to do a quantity take-off from drawings.
What are the rules for side, two-storey and roof extensions?
Side extensions
Any extension beyond a side wall must be single storey, no more than 4 metres high, and no wider than half the width of the original house, measured at its widest point (A.1(j)). A side wall is any wall that is neither front nor rear. A wrap-around extension that runs past the rear wall has to meet the side rules and the rear rules at once. On a corner plot, a side wall facing the road counts as a highway elevation, and nothing can go in front of it.
Two-storey extensions
No more than 3 metres beyond the rear wall and at least 7 metres from the boundary opposite it. The roof pitch must match the original house so far as practicable (A.3(c)). Any upper-floor window in a side wall or roof slope must be obscure-glazed and non-opening, unless the opening part is more than 1.7 metres above the floor (A.3(b)).
Materials
Exterior materials must be of a similar appearance to the existing house, except for a conservatory (A.3(a)).
Lofts and rooflights
Roof enlargements fall under Class B: no higher than the existing roof, nothing beyond the front roof slope facing a highway, and no more than 40 cubic metres of added roof space on a terraced house or 50 cubic metres on any other house. No balconies, and not on designated land. Rooflights fall under Class C and may not stand more than 0.15 metres proud of the roof slope. See how to price a loft conversion.
How does the prior approval route for a larger rear extension work?
A single-storey rear extension between 3 and 6 metres deep (4 and 8 metres for a detached house) is permitted development only after the neighbour consultation in paragraph A.4. The developer, usually the householder or their agent, gives the details to the council, and the outcome sets your start date.
- 01Give the council the details before starting. A written description with the depth beyond the original rear wall, the maximum height and the eaves height (for the total enlargement, if joined to an existing extension), a site plan, the addresses of adjoining premises, a contact address, an email address if wanted, and any fee due.
- 02The council checks it. It can refuse where the extension does not comply, or where there is not enough information to tell.
- 03The council notifies the neighbours. Each adjoining owner or occupier gets a notice giving a date for representations at least 21 days away, public holidays not counted.
- 04An objection triggers prior approval. If a neighbour objects, the council decides the impact on the amenity of all adjoining premises, not only the objector’s, and can grant approval with conditions.
- 05Wait for one of three events. Written notice that prior approval is not required, written notice that it is given, or 42 days from the council receiving the details with no decision notified (A.4(10)).
- 06Build what was described. The work must follow the approved details, or the details submitted, unless the council agrees otherwise in writing (A.4(11)).
NoteThe route is not available on article 2(3) land or a site of special scientific interest. There, the 3 and 4 metre limits are the maximum without a planning application.
Where do permitted development rights not apply?
- Flats and maisonettes. Article 2 excludes them from ‘dwellinghouse’, so Class A gives them nothing.
- Houses created under change-of-use rights, such as Class MA of Part 3, and houses built under Part 20 (A.1(a) and (l)).
- Article 2(3) land: conservation areas, areas of outstanding natural beauty, National Parks, the Broads and World Heritage Sites. Class A still applies, but not to side extensions, rear extensions of more than one storey, or cladding in stone, artificial stone, pebble dash, render, timber, plastic or tiles (A.2). Class B loft enlargements are not permitted at all.
- Article 4 directions. The council or the Secretary of State can withdraw some or all rights for an area or a property (article 4).
- Conditions on an earlier permission. Nothing in the Order permits development contrary to a condition on a planning permission (article 3(4)), and the technical guidance warns that rights may have been removed on the original permission for the house or a later one.
- Unlawful buildings. The rights do not attach to a building that was itself built unlawfully (article 3(5)).
- Listed buildings. Class A does not exclude them, but works that affect the character of a listed building need listed building consent under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990, and doing them without it is an offence under section 9.
The technical guidance tells householders to check with the council for Article 4 directions and conditions before starting. Do it before you quote, because a house that has lost its rights needs an application, a design and a decision before a start date means anything.
Should the client get a lawful development certificate?
It is optional, and often sensible. Under section 192 of the Town and Country Planning Act 1990, the council issues a certificate of lawfulness of proposed development if satisfied the work would be lawful if begun on the date of the application. Planning merits play no part: it is a legal test against the Order.
Once granted, the work described is conclusively presumed lawful unless something material changes before it starts. The government’s planning guidance gives a new Article 4 direction as an example, so do not sit on a certificate for long.
Without one, the risk is enforcement. Under section 171B, as amended from 25 April 2024, the council in England can take action against building work done without permission for ten years from substantial completion. The old four-year limit still applies to work substantially completed before that date, and remains the limit in Wales.
A lawful development certificate answers the planning question only. It says nothing about Building Regulations, party walls or listed building consent.
How do the limits work on two example houses?
Two invented houses, checked against Class A. Neither is a real address.
| Check | House A: 1960s semi, not on designated land | House B: Victorian terrace in a conservation area |
|---|---|---|
| Proposal | Single-storey rear extension, 3 m deep, flat roof 3 m high, 1 m from the side boundary | Extend an existing 2 m rear extension to 5 m in total, and infill the side return |
| Article 4 or conditions | None, confirmed with the council | None found, but the area is article 2(3) land |
| Rear depth | 3 m against a 3 m limit: passes | Total enlargement 5 m against a 3 m limit, with no prior approval route: fails |
| Height and eaves | 3 m high, under 4 m; eaves within 2 m of the boundary at 3 m: passes | Not reached |
| Side elevation | Not beyond a side wall: passes | Side return infill extends beyond a side wall, not allowed on article 2(3) land: fails |
| Coverage | Curtilage 300 m², original house 60 m²: half the remainder is 120 m²; later garage 15 m² plus extension 18 m² is 33 m²: passes | Not reached |
| Materials | Matching brick: passes | Not reached |
| Outcome | Permitted development; a lawful development certificate is optional | Householder planning application needed |
Illustrative figures for a worked example, not real properties. Check every limit against the drawings and the council’s records.
House A could still need a party wall notice if its foundations go deeper than the neighbour’s within 3 metres, and both houses need Building Regulations approval. House B’s owners could instead keep the rear extension to 3 metres in total and drop the side infill, or apply for permission for the design they want.
Which other approvals does an extension need?
Permitted development settles planning and nothing else. The technical guidance says the rights do not remove requirements under the Building Regulations or the Party Wall Act.
- Building Regulations approval, from the council or a registered building control approver, ending in a completion or final certificate. See building control completion certificates.
- Party wall notices where the work touches a party wall, builds at the boundary or digs near the neighbour’s foundations. See party wall notices.
- Listed building consent, where the house is listed.
Write down in your quote who is responsible for each approval and what happens to the price and programme if the planning answer changes. The costs that follow from each are covered in how to price a house extension, and the wording in is a builder’s quote legally binding?
Free toolUK construction glossaryCurtilage, prior approval, lawful development certificate and the rest of the planning vocabulary, one sentence each.How does Estimark help with planning?
Estimark’s EstiPlan: Planning Applications bolt-on keeps the application on record: the site, the local planning authority it falls under, and the type, including householder, prior approval and lawful development certificate. It checks the site against seven constraint categories, conservation area, listed buildings and Article 4 directions among them, timestamps the check, and holds a constraint nobody has checked as unknown rather than clear. Treat the result as a first pass to confirm against the council’s own records. It keeps the validation date apart from the submission date, and you submit through the Planning Portal yourself.
Sources
- The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1 (legislation.gov.uk)
- GPDO 2015, article 2 (legislation.gov.uk)
- GPDO 2015, article 3 (legislation.gov.uk)
- GPDO 2015, article 4 (legislation.gov.uk)
- GPDO 2015, Schedule 1, Part 1 (legislation.gov.uk)
- The Town and Country Planning (General Permitted Development etc.) (England) (Amendment) Order 2026 (legislation.gov.uk)
- Permitted development rights for householders: technical guidance (GOV.UK)
- Lawful development certificates (GOV.UK)
- Town and Country Planning Act 1990, section 192 (legislation.gov.uk)
- Town and Country Planning Act 1990, section 171B (legislation.gov.uk)
- S.I. 2024/452, regulation 5 (legislation.gov.uk)
- Planning (Listed Buildings and Conservation Areas) Act 1990, section 7 (legislation.gov.uk)
- The Town and Country Planning (General Permitted Development) (Amendment) (Wales) Order 2013 (legislation.gov.uk)
- The Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (legislation.gov.uk)
- The Planning (General Permitted Development) Order (Northern Ireland) 2015 (legislation.gov.uk)
Questions
Frequently asked
Can I build a 6 metre rear extension without planning permission?
On a semi-detached or terraced house in England, yes, if it is single storey, no more than 4 metres high, and goes through the prior approval neighbour consultation first. A detached house can go to 8 metres the same way. The route is not available in conservation areas, other article 2(3) land or a site of special scientific interest.
Do you need planning permission for an extension in a conservation area?
Not always. A single-storey rear extension within the 3 metre or 4 metre limits can still be permitted development, but side extensions, rear extensions of more than one storey, certain cladding and the larger home extension route are all excluded, and an Article 4 direction may remove more.
Do flats and maisonettes have permitted development rights for extensions?
No. The 2015 Order’s definition of a dwellinghouse excludes a flat and a building containing flats, so Class A does not apply and an extension needs a planning application.
What does ‘original house’ mean in permitted development?
The house as it stood on 1 July 1948, or as first built if it was built after that date. Later extensions by earlier owners count against the limits and do not move the rear wall that depth is measured from.
Is a lawful development certificate compulsory?
No. It is a certificate under section 192 of the Town and Country Planning Act 1990 confirming the proposed work would be lawful. It gives certainty, and the work is presumed lawful unless something material changes before it starts.
If an extension is permitted development, does it still need Building Regulations approval?
Yes, in most cases. Permitted development grants planning permission only. Building Regulations approval, and party wall notices where they apply, are separate.
Read next
How to price a house extension
Scope first, the regulatory costs that get missed, the build-up in order, and the exclusions to write down.
Party wall notices: what a builder must serve and when
The three notices, the one and two month periods, the 3 and 6 metre rules, and what happens on dissent.
Building control completion certificates
Which route, the notices, the inspections and the certificate a homeowner will ask for when they sell.
Estimark: EstiPlan Planning Applications
LPA lookup, a constraints check that keeps unknown apart from clear, and condition tracking. You submit the pack.
UK construction glossary
The contractual, tax and safety vocabulary, defined in a sentence each.
Run the paperwork once.
Estimating, jobs, invoicing, CIS and compliance in one place. 14 days, full access, no implementation fee and no card needed.