Quoting

How to write a builder’s quote that wins the job and protects you

6 min read

The short answer

A quote that wins and protects you says exactly what you will do, what you will not do, what it costs with VAT shown, when you can start and how long it will take, how and when you will be paid, how changes will be priced, and how long the price holds. Write the scope in the customer’s language, list the exclusions and the assumptions the price rests on, and price uncertain items as provisional sums rather than guesses. Offer a choice of two or three options where the job allows. Send it quickly, make it easy to accept, and follow it up. With a homeowner, what you write can become part of the contract under section 50 of the Consumer Rights Act 2015, so the quote is the first line of your defence as well as your sales pitch.

At a glance

Scope
What you will do, in the customer’s words
Exclusions
Listed, not implied
Uncertain items
Provisional sums, stated as such
Validity
A date the price holds until
Payment
Deposit, stages and final, with dates
What you write (homeowner)
Can bind you: CRA 2015 s.50

What should a builder’s quote include?

  1. 01Who and where. Your business details, the customer, the site address, a quote number and the date.
  2. 02The scope, in the order the work will be done, in words the customer would use.
  3. 03What is included, item by item, with quantities where they help.
  4. 04What is not included, listed: decoration, skip permits, making good beyond the work area, items the customer is supplying.
  5. 05Assumptions the price rests on: access, ground conditions, the state of hidden structure, no asbestos found.
  6. 06Provisional sums for anything you cannot price yet, named and stated as an allowance.
  7. 07The price, net, VAT and total, or a clear statement that you are not VAT registered.
  8. 08Options, each with its own price.
  9. 09Programme: the earliest start and the expected duration.
  10. 10Payment terms: the deposit, the stage payments and what triggers each, the final payment, and the days to pay.
  11. 11How changes are handled: priced and agreed in writing before the work is done.
  12. 12Validity: the date the price holds until.
  13. 13How to accept, and for a homeowner, the cancellation information the law requires.

Whether a quote binds you, and how it differs from an estimate, is in is a builder’s quote legally binding. The cancellation information a homeowner contract needs is in can a customer cancel building work.

How do exclusions and assumptions protect your margin?

Under section 50 of the Consumer Rights Act 2015, what you say or write to a homeowner about the work becomes a term of the contract if they take it into account when deciding to go ahead. That cuts both ways. A vague scope binds you to whatever the customer reasonably understood it to mean. A clear one, with exclusions and assumptions written down, binds you to that and nothing more.

So write the assumption next to the item it affects. "Price assumes existing floor joists are sound; if any need replacing, this will be priced as a variation before the work is done" turns a rotten joist from an argument into a variation. The process for pricing and agreeing those is in variations in construction.

If no price is fixed, a consumer pays a reasonable price and no more (CRA 2015 s.51). If no time is fixed, the work must be done within a reasonable time (s.52). A quote that states both removes the argument.

Where an item cannot be priced until something is opened up, use a provisional sum and say so, rather than burying a guess in the total. How provisional sums and PC sums work is in provisional sums and PC sums.

How do you make a quote more likely to be accepted?

  • Send it while the visit is fresh. A customer who met three builders in a week often goes with the first clear quote that arrives.
  • Offer options. Two or three versions, for example a standard and an upgraded specification, turn "yes or no" into "which one". Price each one separately so the customer can compare.
  • Show the programme. "Start 2 March, about four weeks on site" answers the question every homeowner asks next.
  • Make the payment terms easy to read. A table of the deposit, stages and final payment is easier to agree to than a paragraph.
  • Make it easy to accept. A link the customer can open and sign from their phone removes the printer from the decision.
  • Follow it up. A short, polite reminder after a few days, again after a week and again after a fortnight, and one before the validity date runs out.

The number underneath all of this has to be right first. The build-up, from labour and materials to overheads and margin, is in how to price a construction job.

Free toolMarkup vs margin calculatorCheck the margin a quoted price actually leaves, and the price a target margin needs, before the quote goes out.

How long should a quote be valid for?

Long enough for the customer to decide, short enough that your material prices still hold. A month suits most domestic work; a quote with a lot of timber or steel in it may justify less. State the date, not just the number of days, and say what happens after it: the price is reviewed, not automatically increased.

A validity date also gives your follow-up a reason. "Your quote holds until 31 March" is a better message than "just checking in".

What should the payment terms say?

The deposit and what it covers, each stage payment and the visible stage that triggers it, the final payment, and how many days the customer has to pay each invoice. How to size the deposit and what happens to it if the customer cancels is in how much deposit should a builder take. How stage payments keep a job funded is in cash flow for small builders.

How does Estimark help you quote?

In Estimark a quote is built line by line from your own price book, with quantities, units, rates and the VAT rate per line, and optional lines grouped so the customer picks one option from each group. Exclusions, assumptions and payment terms go in the quote’s notes and terms, a deposit is set as a percentage or a fixed sum, and a valid-until date expires the quote automatically. On the web you can start from a saved template; on site, the iPhone and Android apps build a quote from the same price book.

The quote goes out as a branded PDF and a link. The customer opens it on their phone, chooses between the options, types their name and draws their signature, and Estimark records the time, the IP address and the browser it was signed from. The accepted quote becomes a job with its lines, and the deposit invoice is raised there and then. Until it is accepted, Estimark reminds the customer 3, 7 and 14 days after sending and again shortly before it expires, and you can change those timings or switch them off. See quotes and online acceptance and the client portal.

Sources

Questions

Frequently asked

What should be included in a building quote?

The scope, what is included and excluded, the assumptions the price rests on, any provisional sums, the price with VAT shown, options, the start date and duration, payment terms, how changes are priced, how long the price holds, and how to accept.

Should I list exclusions on a quote?

Yes. Under section 50 of the Consumer Rights Act 2015, what you tell a homeowner about the work can become part of the contract. Listing what is not included is the plainest way to stop a customer reasonably assuming it is.

How long should a builder’s quote be valid?

Long enough for the customer to decide and short enough for your material prices to hold. A month suits most domestic work. State the expiry date on the quote.

Should I give the customer options?

Where the job allows it, yes. Two or three separately priced options let a customer choose a specification rather than accept or reject one price.

How often should I follow up a quote?

A short reminder after a few days, again after about a week and a fortnight, and once before the price expires. Each one should make it easy to ask a question or accept.

Build on a solid foundation.

Run the whole business without an implementation project and without legacy baggage. Every plan starts with 14 days free. No card needed.

Estimating · Jobs · Invoicing · CIS · H&S · Reactive maintenance