Field notes

The rules you have to work to

Plain explanations of the UK regulations, deadlines and pricing decisions that decide whether a construction business makes money. Written for contractors, with the statute cited, and useful whether or not you ever buy anything from us.

59 articles

Showing 14 of 59 · Compliance

Compliance

Building control completion certificates: how to get one and why it matters

Which building control route produces which certificate, the notices from start to finish, what the completion notice must say and who signs it, and what happens when there is no certificate.

16 November 202612 min
Health & Safety

COSHH for builders: silica dust and hazardous substances

What COSHH asks of a builder, the silica limit in EH40, the controls HSE expects for cutting, chasing and sanding, face-fit testing, health surveillance, and an assessment worked through for one task.

12 November 202612 min
Subcontractors

How to vet a subcontractor before they start on site

The checks to run before a subcontractor starts, which of them the law requires and which your contract does, and the right to work duty that reached individual subcontractors on 1 October 2026.

4 November 202612 min
Compliance

Do you need planning permission for a house extension?

The Class A permitted development limits for rear, side and two-storey extensions in England, the larger home extension prior approval, where the rights do not apply, and two worked houses.

31 October 202612 min
Health & Safety

What must a builder report under RIDDOR, and by when?

Deaths, specified injuries, over-seven-day injuries, dangerous occurrences and six occupational diseases: who reports each on a shared site, how, and by when.

19 October 202613 min
Contracts

Party wall notices: what a builder must serve and when

Who serves a party wall notice, what each of the three notices must say, the periods, the 14-day reply, surveyors and the award, and a worked timeline for a rear extension.

15 October 202613 min
Regulatory change

Awaab’s Law Phase 2: what changes on 30 November 2026

Nine hazard categories join the clocks, one definition moves, one carve-out arrives, and Scotland’s own version started on 6 October. The dates, the instruments, and what a landlord and its contractors record.

16 September 202610 min
Regulatory change

CDM, the F10 and the Building Safety Act: where the rules stand in 2026

The F10 thresholds are what they were in 2015. The thing that changed is that a principal contractor in England is now two appointments with one name, and a tall residential building is a different regime altogether.

16 September 20268 min
Gas

Landlord gas safety certificates: the CP12 rules explained

Twelve months, 28 days, two years, two months. Four numbers cover almost every landlord gas safety question.

7 July 20266 min
Electrical

Do I need an EICR, and how often?

For rented homes in England it’s five years, and it’s the law. Everything else depends on the installation, and the inspector sets the interval.

30 June 20267 min
Health & Safety

CDM 2015: when do I need to notify HSE on an F10?

Two thresholds decide it, and one of them has an "and" in it that half the industry reads as "or". Notification is also the least important part of CDM.

23 June 20266 min
Health & Safety

What must a RAMS actually contain?

A risk assessment says what could go wrong. A method statement says how the work will be done so it doesn’t. Most rejected RAMS have plenty of the first and none of the second.

16 June 20267 min
Social housing

Awaab’s Law: what social landlords must do about damp and mould

Ten working days to investigate, three to report back, five to make safe. The deadlines are statutory, they run in working days, and they’re enforceable in the county court.

9 June 20268 min
CIS

CIS tax months explained: why the 6th to the 5th matters

A payment dated the 3rd belongs to last month’s return. Get the tax month wrong and you file two returns incorrectly instead of one.

28 April 20266 min
Estimark

Built for the way UK contractors actually work

Estimating, quoting, job management, timesheets, invoicing, CIS and site safety, with an offline field mode that installs to a phone and keeps working with no signal.

Build on a solid foundation.

Run the whole business without an implementation project and without legacy baggage. Every plan starts with 14 days free. No card needed.

Estimating · Jobs · Invoicing · CIS · H&S · Reactive maintenance