Field notes

The rules you have to work to

Plain explanations of the UK regulations, deadlines and pricing decisions that decide whether a construction business makes money. Written for contractors, with the statute cited, and useful whether or not you ever buy anything from us.

59 articles

Showing 11 of 59 · Pricing

Estimating

How to do a quantity take-off from drawings

Reading scale, measuring from PDFs, centre-line girths and deductions, with a worked extension example and the checks that stop a wrong quantity reaching a quote.

6 November 202611 min
Running the business

What is cost value reconciliation (CVR), and how do you run one?

Value earned against cost incurred, job by job and month by month: the method, the adjustments that make or break it, and the signs a job is losing money before the final account says so.

2 November 202610 min
Estimating

How to price a loft conversion

What a roof changes about pricing: the steels and new floor, the stair and its headroom, fire protection down to the front door, the dormer limits, and working over a family.

23 October 202612 min
Estimating

How to price a house extension: a builder’s method

Scope first, then the site, then the build-up stage by stage, with the regulatory costs that get missed and the exclusions that stop the arguments.

5 October 202613 min
Pricing

What does construction software actually cost a UK contractor?

Five categories, six billing units and several vendors who publish nothing. The total a ten-person firm pays every month is arithmetic nobody sat down and did.

15 September 202617 min
Estimating

What are preliminaries, and how do you price them?

The cost of running a site rather than building anything, and the part of a tender most often guessed at, then paid for out of the margin.

7 September 20265 min
Contracts

Variations in construction: how to record and price them

The commonest reason a job finishes on a loss is not bad pricing. It is work done on a verbal instruction that nobody wrote down.

7 September 20265 min
Pricing

Markup and margin: the mistake that costs builders money

Adding 20% to your cost gives you a 16.7% margin, not 20%. On a £200,000 turnover that gap is around £6,600 a year, every year.

7 September 20264 min
Pricing

Dayworks: when they apply and what the sheet must show

The valuation method of last resort, and the one most often used first. An unsigned sheet is an invoice nobody agreed to.

7 September 20264 min
Pricing

How to price a job properly: labour, materials, plant and overhead

Most underpriced jobs aren’t underpriced on the trade rate. They’re underpriced because the overhead was never in the number at all.

21 July 20267 min
Pricing

What is a Schedule of Rates, and when should you price work with one?

A pre-agreed price list for units of work. It takes the argument out of every small job and shifts the risk onto how accurately you measure.

14 July 20266 min
Estimark

Built for the way UK contractors actually work

Estimating, quoting, job management, timesheets, invoicing, CIS and site safety, with an offline field mode that installs to a phone and keeps working with no signal.

Build on a solid foundation.

Run the whole business without an implementation project and without legacy baggage. Every plan starts with 14 days free. No card needed.

Estimating · Jobs · Invoicing · CIS · H&S · Reactive maintenance